Notification Manager Main Form

The main form of the Notification Manager has two lists of schemes:

  1. The list in the upper part of the window: Schemes for construction

  2. The list in the lower part of the window: Completed schemes

A scheme in the Schemes for construction list has been installed, but is not currently active: you cannot subscribe to it, nor will notifications be sent from it. It can, however, be modified.

A scheme in the Completed schemes list is ready to use. If it has also been started (status is "Started"), it accepts subscriptions and notifications are sent. A scheme in this list, started or not, cannot be modified.

You can move a scheme from the Schemes for construction list to the Completed schemes list by selecting it and clicking Complete.

You can copy a scheme from the Completed schemes list to the Schemes for construction list by selecting it and clicking Copy for construction.

 

You can quickly access a specific area within this topic by using these links:

Schemes for construction
Completed schemes

Menu items

Buttons

Shortcut menus

 

To open the topic about the Template Administration tool click here.

Schemes for construction

The schemes in this list have been installed or created (for example, by clicking File, New; or by clicking File, New from template). An installed scheme is available in the Notification Manager, but it is not active. When a scheme is in this state, it can be opened for modification in the Notification Designer. A scheme can be moved from this list to the Completed schemes list by selecting it, and then clicking Complete scheme.

For each scheme in the list, the following information is displayed:

Name
The name of the scheme. Note that this is the name that you give the scheme when you install it.

Updated
Date that the scheme was last modified

Alert
The Alert field is used to show that an error has occurred that needs attention. For a scheme in this list, an alert means that the business entity has been changed (in Navision), so that business entity fields have either been removed or modified. (Note that adding fields does not pose a problem.)

When a scheme in the list is flagged with an alert, you can click File, View Log to open the log file and get more information.

Completed schemes

The schemes in this list are ready for use. They can be started, stopped or copied to Schemes for construction.

To start a scheme in the list , you select it and then click Start. After a scheme has been started, it becomes available for subscription, and notifications will be sent.

To stop a scheme, you select it and then click Stop. When a scheme is stopped, new subscriptions are not accepted and notifications are not sent.

To copy a scheme to the Schemes for construction list, you select and click Copy for construction.

When a scheme that has previously been completed is copied to the Schemes for construction list and then modified, you can move it back to the Completed schemes list just like a brand new scheme. In this situation, there are two different possibilities:

  1. As part of the modification, you give the scheme a new name. You can move it to the Completed schemes list just like any new scheme.

  2. As part of the modification, you do not change the name of the scheme. If you move it back to the Completed schemes list it will overwrite the "old scheme". A confirmation dialog box will appear before the move is completed.

For each scheme in the list, the following information is displayed:

Name
The name of the scheme. Note that this is the name that you give the scheme when you install it.

Updated
The date that the scheme was last modified.

Status
The status of the scheme. There are three options:

Alert
The Alert field is used to show that an error has occurred that needs attention. For a scheme in this list, two errors can occur:

When a scheme in the list is flagged with an alert in the list, you can click File, View Log to open the log file and get more information.

Menu Items

The following is a description of the menu items in the drop-down menu under File:

The following is a description of the menu items in the drop-down menu under Tools:

The following is a description of the menu items in the drop-down menu under Help:

Buttons

The following buttons are on the main form:

Shortcut Menus

In both lists of schemes – the Schemes for construction list and the Completed schemes list – a shortcut menu is available for the most common tasks. To access the shortcut menu, right-click a scheme in the list.

Shortcut menu in the Schemes for construction list:

Shortcut menu in the Completed schemes list: