In the Capacity Constrained Resource table you can assign finite loading to a machine center or a work center.
This table enables you to assign to those areas that you regard as critical and mark them to accept a finite load instead of the default infinite load that other resources accept.
A critical area can be a work center or machine center that you have identified as a bottleneck and would like to establish a limited load for.