Run Time Field

The Planning Routing Line Table

This field contains the run time in this field.

The program automatically fills in this field, but you can change it.

Run time is the time required to process or manufacture an item or a lot in a specific operation. Run time does not include setup time.

Note that the throughput time can be expressed in various units of measure. However, if you do so it will affect cost calculations.