Move Time Field

The Machine Center Table

Here you can enter the move time required for a production lot on this machine. The move time is the time that a lot spends in transit from the previous operation to the current operation at this machine center.

The move time always refers to the time unit of measure entered in the Move Time Unit of Meas. Code field.

The program transfers the move time to the Routing Line table when you enter the number of the machine center into the No. field of the Routing Line table. The move time is used as default to the routing line. You can change it if you want to.

You can enter a decimal value in this field.