Direct Unit Cost Field

The Work Center Table

Here you can enter the direct unit cost of the work center at one unit of measure. The unit of measure is defined in the assigned work center.

The basis of the direct unit cost is the usage quantity per time interval set in the Unit of Measure Code field or per unit depending on the entry in the Unit Cost Calculation field.