Work Shift Code Field

The Capacity Ledger Entry Table

This field contains the work shift that this machine center was planned at on the posting date, or in which work shift the production, on which this posted entry is based, took place.

The program copies the work shift code from the Work Shift Code field on the item journal line.

You cannot change the work shift code because the capacity ledger entry has already been posted.