Allocated Time Field

The Prod. Order Capacity Need Table

This field shows the allocated time of the capacity need for a production order.

The allocated time is the assigned time to a specific future production order. The allocated time is always shown in minutes. If, for example, the whole day in an 8-hour work shift is allocated to this production order capacity need, this field will show 480 minutes