You can assign any quality measures to an operation. The assigned quality measures specify the features and tolerances to be tested for quality assurance.
Open the Routing
window.
Select the operation by clicking the operation line to be processed.
Click Operation, Quality Measures.
Press Esc to exit the window. The entered values are copied and assigned to the operation.
Assigning Personnel to Operations
Assigning Quality Measures to Standard Tasks