Work Center Load Report

This report shows you a list for the load on a work center. The load on a work center is the sum of the required number of times that all the planned and actual orders are run on the work center in a specified period.

You can define what is included in the report by setting filters. You can set additional fields on the Work Center Group or the Work Center tabs by clicking the Field field, then clicking the AssistButton that appears to the right. You can also determine what is shown in the report by filling in the fields on the Options tab. Fill in the fields as follows:

Work Center Group

Code: Enter the work center group code if you only want to print this evaluation for a specific work center group.

Work Center

Work Shift Filter: Enter a work shift here if you only want to print this evaluation for a specific work shift.

Options

Starting Date: Enter the starting date for the evaluation.

No. of Periods: Enter the number of time intervals that the evaluation is to be created for.

Period Length: Enter the length of the time interval, for example 1W = one week.

Load greater than (%): Here you can enter a filter to print only work centers whose loads exceed this percentage, for example, if you want to print all work centers with a load of over 95% in order to troubleshoot a particular problem.

To see the result of the filters that you have defined for the table, click the up-arrow at the lower left-hand corner of the window.

To see the sorting keys and to determine the order in which the information will be displayed in the report, click Sort.

To print the report, click Print. To see the report on the screen before printing, click Preview. If you do not want to print the report now, click Cancel to close the window.